arm rail rise vs gutter layer plus final layer

Home Bar Forum Forums Home Bar Project Construction Questions EHBP-09 45 Degree Corner L-Shaped Bar arm rail rise vs gutter layer plus final layer

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #19473 Score: -1
    Rnorman
      -1 pt

      Not sure if I’m missing something but here goes,
      The beer gutter layer is 3/4″, the final top layer is 3/4″ = 1 1/5″
      The specs on the Kegworks arm rail says the rise from the base layer to the final layer overlap is 1 1/4″
      Sure I can add some 1/4″ sheathing or ? to the 3″ base layer overhang to make up the difference is this the way to go.

      This post has received 1 vote down.

      #20920 Score: 0
      Rnorman
        -1 pt

        Disregard found a thread on the topic

      Viewing 2 posts - 1 through 2 (of 2 total)
      • You must be logged in to reply to this topic.
      Easy Home Bar Plans